511 Days Building My Dream House. From Start to Finish, Step by Step in One Video

511 Days Building My Dream House. From Start to Finish, Step by Step in One Video

1,850,361 View

00:00:00 - 1. INSULATED SWEDISH FOUNDATION
00:00:04 - Laying of sewer pipes
00:01:48 - Insulated permanent formwork
00:04:40 - Insulation of the foundation from below
00:07:53 - Cold and hot water pipes
00:09:24 - Underfloor heating (house heating)
00:11:20 - Pipes for electrical wires
00:12:42 - Sewer exits
00:13:07 - Reinforcement of the foundation
00:13:52 - Mortgages for fixing the terrace
00:15:37 - Lighthouses for leveling concrete
00:16:27 - Formwork supports
00:17:08 - Crimping of the underfloor heating system
00:17:41 - Preparation for pouring concrete
00:18:54 - Pouring concrete
00:21:05 - Insulated blind area of the foundation
00:21:53 - 2. THE FIRST FLOOR IS MADE OF AERATED CONCRETE
00:22:17 - The first row of masonry
00:23:49 - The second row of masonry
00:24:32 - Reinforcement of window sills
00:25:55 - Masonry of external walls with adhesive foam
00:30:38 - Interior wall masonry
00:31:36 - Formation of a hole under the chimney of the fireplace in the corner
00:33:03 - Ordinary lintels over doorways
00:34:00 - Aerated concrete column (floor support with electrical corrugations inside)
00:35:24 - Production of U-blocks
00:36:09 - Installation of window openings
00:40:14 - Manufacture and installation of armopoyas blocks
00:43:31 - Reinforcement and filling with cement-sand mixture
00:45:10 - 3. TERRACE
00:45:11 - Terrace piles
00:45:55 - Tying piles with a board
00:46:28 - Fixing the board to the foundation with the help of mortgages
00:47:46 - The frame of the terrace
00:50:15 - 4. OVERLAP
00:50:16 - Tying the walls with a board
00:51:20 - Beams made of 145*195mm timber
00:51:39 - Beams made of board 45*195mm
00:55:33 - Cladding with 18mm OSB plates
00:57:21 - 5. THE FRAME OF THE SECOND FLOOR
00:57:53 - Assembly of the side walls of the second floor
00:59:32 - Lifting of the side walls of the second floor
00:59:49 - Preparation of parts and assembly of pediments
01:03:49 - Interior walls of the second floor
01:05:05 - 6. OPEN ROOF TRUSS SYSTEM
01:05:06 - Beams made of 145*195mm timber for supporting rafters
01:06:26 - Manufacture and installation of a rafter system
01:08:25 - The result of the work
01:08:32 - Interior planking along the rafters (open rafter system)
01:09:58 - 7. POWERFUL ROOF INSULATION
01:09:59 - Vapor barrier
01:10:19 - Hemming the roof overhangs with a planed board
01:11:34 - Dobs made of 50*150mm board
01:12:40 - Roof insulation with 150mm polyisocyanurate
01:16:04 - 8. ROOF AND SKYLIGHTS
01:16:11 - Installation of a 22*100mm board crate
01:17:36 - Openings for skylights
01:18:37 - Cladding with 12mm OSB plates
01:20:52 - Installation of the skylight
01:00:00 - Waterproofing with lining carpets for flexible tiles (self-adhesive and mechanically fixed)
01:22:19 - Waterproofing of the skylight
01:24:48 - The second roof slope
01:27:48 - Cornices and balconies
00:30:17 - Installation of flexible bitumen shingles
01:33:11 - Waterproofing of the skylight
01:41:01 - Ventilation of the under-roof space
01:44:18 - 9. DRAINAGE SYSTEM
01:44:19 - Installation of gutter brackets
01:45:53 - Installation of gutters
01:47:55 - Installation of downpipes
01:52:21 - 10. FILLING AROUND THE HOUSE
01:53:38 - 11. INSULATION OF THE SECOND FLOOR
01:53:39 - Vapor barrier of the walls of the second floor
01:54:34 - Insulation of 100mm polyisocyanurate
02:01:18 - 12. BALCONIES
02:01:19 - Formation of a slope for water drainage
02:03:08 - Waterproofing of balconies
02:05:24 - Wooden window quarters
02:06:34 - 13. MARBLE FACADE FINISHING
02:06:35 - Preparation of the walls
02:07:32 - Installation of facade finishing based on marble chips
02:22:30 - Removing the protective film
02:26:04 - Waterproofing of window openings
02:26:26 - 14. FACADE DECORATION WITH WOOD
02:26:27 - Preparation of details
02:27:16 - Facade cladding with wood (spruce plank)
02:31:16 - Window and door trim
02:33:39 - Decorative elements made of wood
02:43:24 - 15. ELECTRICAL INSTALLATION
02:43:25 - Installation of desoldering boxes
02:43:46 - Laying wires for lighting
02:43:53 - Connecting wires
02:44:29 - THE FRONT DOOR
02:44:30 - Waterproofing of the doorway
02:44:53 - Installation of the heating cable in the door box
02:45:20 - Filling the door box with foam
02:45:41 - Installation of the door frame in the opening
02:46:12 - Installation of the door leaf
02:46:34 - Window frames on the first floor
02:47:48 - 16. TERRACE AND BALCONY FLOORS
02:47:49 - Preparation of the decking
02:48:41 - Installation of the board on the terrace floor
02:51:14 - Finishing painting
02:52:09 - Floors on balconies
02:54:16 - 17. INSTALLING WINDOWS
02:54:17 - Installation of windows
02:55:48 - Window trim at the bottom
02:56:31 - Platbands on the corners of the second floor
02:56:54 - Sealing of window tides
02:57:46-18. FENCING OF TERRACES AND BALCONIES
02:58:01 - Terrace fencing
03:02:09 - Balcony fencing
03:05:11 - 19. INSTALLATION OF A SLIDING PORTAL
03:06:04 - 20. FACADE LIGHTING
03:07:05 - 21. RESULT