During the past 30 days we worked on installing a waste water recycling system for our off grid property..30 DAYS of work - START to FINISH // Sign up to Milanote for free with no time-limit: https://milanote.com/modernhousecabin
SUPPORT THE CHANNEL:
Become a Patron: https://www.patreon.com/join/modernhousecabin
BUY ARCHITECTURAL GUIDES:
https://www.modernhousecabin.com/shop/
00:00 Chapter 1: Materials
01:30 Chapter 2: dig a BIG hole
06:07 Chapter 3: install the tank
10:30 Chapter 4: the trench
18:32 Chapter 5: making all the exterior connections
23:20 Chapter 6: how I am managing the build of the new house while doing so many things at the same time
25:00 Chapter 7: let’s clean this mess
29:00 Chapter 8: interior connections and final details
38:20 Chapter 9: no more compost toilet
40:58 Final Chapter: let’s make this look GOOD, shall we?
WATCH MORE:
► 1st Episode House Build: https://youtu.be/kZE6sQSoRpM
► Workshop Build Timelapse START to FINISH: https://youtu.be/ViFhbb_R9u8
► Workshop Build Series: https://bit.ly/WorkshopBuildSeries
► Cabin Build Timelapse START to FINISH: https://youtu.be/fkVfX2hUlc8
► Cabin Build Series: https://bit.ly/CabinBuildSeries
SUBSCRIBE for new videos: https://bit.ly/mhcsubscribe
INSTAGRAM: https://www.instagram.com/modernhousecabin/